Delaware · Permit requirements

Delaware oversize permit requirements

Delaware states one rule more plainly than any other state states anything: all loads that are reducible must be reduced, no exceptions. There is no negotiating a permit for something that could have travelled in two trips. Carriers used to states where a marginal case can be argued will not find room here.

The rest is compact, like the state. Permits run five days, movement is sunrise to sunset including weekends, and the holiday calendar includes Good Friday — one of the few states to list it. The holiday shutdown starts at noon the day before and does not lift until nine the morning after, so a single holiday removes the best part of three days.

The figures hold two surprises for a state this small. The routine tridem allowance is sixty-nine thousand pounds, higher than almost anywhere on the seaboard, and poles and steel travel legally to seventy feet with five feet of rear overhang. Working the other way, legal height drops to thirteen feet on non-designated highways — six inches under the national figure, which is enough to catch a standard trailer that turns off the main road. Routine permits run to a hundred and twenty feet, fifteen feet wide and fifteen feet high, with a route survey required at fifteen feet and above.

Legal dimensions

At or under these figures, no oversize permit is required in Delaware.

Width
8′6″
Height
13′6″
Gross weight
80,000 lb
Overhang
3′ front, 6′ rear
Steer axle
20,000 lb
Single axle
20,000 lb
Tandem
34,000 lb
Tridem
42,000 lb

Routine permit limits

Above legal dimensions and up to these figures, Delaware issues a permit as routine business. Beyond them the load becomes a superload, reviewed case by case.

Length
120′
Width
15′
Height
15′ — a route survey is required at 15′ and above
6 to 8 axles
120,000 lb
Single axle
20,000 lb
Tandem
46,000 lb
Tridem
69,000 lb

Escort requirements

A load reaching any of these figures needs an escort in Delaware — the figure is the first size that requires one, so a load measuring exactly this much already needs it.

Width
13′1″
Height
15′0″
Length
90′0″

When the load may move

Permit validity. Permits are valid for five days.

Operating time. Sunrise to sunset, including weekends.

Restricted travel. No travel on New Year, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving or Christmas. Movement stops at noon on the day before a holiday and does not resume until 9 AM on the day after.

Worth knowing

  • All loads that are reducible must be reduced — Delaware states this without exception.
  • Good Friday is a restricted travel day, which few states list.
  • The holiday shutdown runs from noon the day before until 9 AM the day after.
  • Legal height drops to 13′ on non-designated highways — six inches under the national figure.
  • Poles and steel travel legally to 70′ with 5′ of rear overhang.
  • The routine tridem allowance of 69,000 lb is among the highest on the seaboard.
Questions

Delaware permits, answered

Will Delaware permit a load that could be split?

No. All loads that are reducible must be reduced, without exception — there is no marginal case to argue here.

How long does the Delaware holiday shutdown last?

From noon the day before until 9 AM the day after, so a single holiday removes the best part of three days. Good Friday is on the list, which few states do.

Why is my 13-foot-6 load overheight in Delaware?

Because legal height drops to 13′ on non-designated highways. A standard trailer that is legal on the main road stops being legal when it turns off.

Can an oversize load travel at the weekend in Delaware?

Yes — sunrise to sunset, weekends included.

How heavy can a tridem be on a Delaware permit?

69,000 lb, which is among the highest routine tridem allowances on the eastern seaboard.

Crossing more than Delaware?

A permit is per state. If the route leaves Delaware, these are the states it most likely enters.

Get a permit quote for Delaware

Enter the load once and the estimator prices every state on the route, flags where an escort is required, and turns the quote into an order.

Price a permit for Delaware

Compiled from published state DOT sources. Regulations change — confirm the current rules before dispatch. Last reviewed 2026-07-30.

Permits, routes and provisions for heavy haul, in all 48 states.

Get Started →